DEVELOPMENT
Following the initial build, the Control Panel is developed, at which point the PLC (Programmable Logic Controller) and the HMI (Human Machine Interface) are programmed. After all necessary programming is done, the panel is completed, and final tests begin to ensure that everything is in proper working order according to the original specifications.
What is included?
- Software design, programming, and device setup
- PLC programming
- HMI graphic design
- RTU configuration