Our multinational industrial manufacturer of automation approached VLS Group to design and build a very specific type of control system for a cooling tower, to be installed at a Niagara region casino. The client had a very strict turnaround time of no more than 3 weeks, and the finished panel needed to be delivered over the winter holidays.

VLS was chosen specifically because of our track record for phenomenal craftsmanship and incredibly fast turnaround times. Our initial design drawings were approved quickly by our client, at which point we procured all necessary materials, fabricated the product and completed the Factory Acceptance Test with time left to spare. As such, VLS Group delivered on time, and on budget for the pleasure of our client.